您好,欢迎访问无锡【如意】搬家公司_无锡搬家公司官网!

无锡搬家公司

专业服务 放心托付!

搬家收费标准

价格合理 无乱收费!

全国咨询热线

0510-81181158

无锡【如意】搬家公司_无锡搬家公司

无锡办公室搬迁_包括各个企事业单位办公室办公用品的迁移

发布时间:2019-08-28人气:7

无锡企业办公室搬迁注意事项:无锡企业办公室搬迁不管是对公司还是对员工个人来说都意义重大,需要注意的事项也很多,包括重要办公用品的保护、重要文件的保存转移。今次就和大家说说办公室搬迁的注意事项。

Notes for office relocation in Wuxi Enterprise: The relocation of office in Wuxi Enterprise is of great significance to both the company and the individual employees, and there are many matters needing attention, including the protection of important office supplies and the preservation and transfer of important documents. This time, I would like to talk to you about the matters needing attention in office relocation. 

现场估价

On-site valuation

1.在搬运之前可以先请搬家公司派员前来现场估价,这样既可以了解该搬家公司的服务质量,还可以让搬家公司事先清楚实际情况,以免双方对搬运量的认知产生误差,对价格引发不必要的争执。

1. Before moving, we can ask the moving company to send staff to the site to evaluate. This can not only understand the service quality of the moving company, but also let the moving company know the actual situation in advance, so as to avoid errors in the perception of the amount of moving and unnecessary disputes over the price.

2.提前处理不需要的物品和文件,处理掉过时的电脑和办公设备,尽量减少需要搬运的东西。

2. Handle unnecessary items and documents in advance, dispose of outdated computers and office equipment, and minimize the need to move things.

装箱时注意箱子不宜过满

Pay attention to packing the box not to be too full

3.装箱时注意箱子不宜过满,适量装箱后,保证箱子完全闭合。为了方便寻找,应对每个箱子进行编号。贵重物品例如笔记本等应由员工随身携带。柜子桌子内的物品必须全部清空。

3. Pay attention to the box should not be too full, after proper loading, to ensure that the box is completely closed. In order to facilitate the search, each box should be numbered. Valuable items such as notebooks should be carried by employees. All items in the cabinet and table must be emptied.

4.拆卸前,首先必须同企业业主切断并拆除该设备的电源,以及水源,气源等和车间动力联系的部位。拆卸中应避免破坏性拆装,必要时加放润滑油,冷却液,清洗液等。所有的电线,电缆不准剪断,拆下来的线头都要有标号,对有些线头没有标号的,要先补充后再拆下,线号不准丢失。

4. Before disassembly, the power supply of the equipment must be cut off and dismantled with the owner of the enterprise, as well as the parts connected with the power of the workshop, such as water source, gas source, etc. In disassembly, destructive disassembly should be avoided. Lubricating oil, coolant and cleaning fluid should be added when necessary. All wires and cables are not allowed to be cut off. The ends of the removed wires must be labeled. If there are no labels on some wires, they should be supplemented before they are removed. The line numbers should not be lost.

拆卸顺序:先小后大,先易后难

Disassembly sequence: small first, big first, easy then difficult

5.拆卸顺序:先小后大,先易后难,先地面后高空,先外围后主机,必须要解体的设备要尽量少分,同时又要满足包装要求,最终达到设备重新安装后的精度性能同拆卸前一致。

5. Disassembly sequence: small first, big first, easy then difficult, first ground then high altitude, first peripheral then main engine, the equipment must be disintegrated as little as possible, while meeting the packaging requirements, and ultimately reassemble the equipment after the accuracy performance is the same as before disassembly.

6.易燃烧的物品或危险物品要清楚注明并安全封口。同时在运输之前要通知搬家公司的员工。

6. Flammable or dangerous goods should be clearly marked and sealed safely. At the same time, the employees of the moving company should be notified before transportation.

辛苦整理!转载请注明来自 http://www.wxbsj.com/show.asp?id=135

你觉得这篇文章怎么样?

0 0
网友评论

管理员

该内容暂无评论

美国网友

推荐资讯